Keep the layout, replace what is worn: the shower, the floor, the vanity or the tile, one licensed team.
Free in-home visit. Written estimate after the visit.
Not every bathroom needs to start from zero. The layout works, the tub is fine, but the shower tile is cracked and the vanity has seen better days. Replacing what is worn and leaving what is sound gets you most of a new bathroom for a fraction of the disruption.
A partial renovation with Rain City replaces the parts you choose on the layout you have: a new tiled shower, new floor tile, a vanity with a stone top, a tub surround, lighting and fixtures. Same samples at home, same 3D model, same licensed team.







Pick the parts that need replacing; the rest stays.
01
The old shower out, waterproofing, a new tiled pan or base, tile, niche and a glass door, on the same footprint.
02
A new tiled surround around an existing or new tub, with a niche and a new valve and spout.
03
New porcelain or stone tile on the floor, with heated floors as an option, the toilet and vanity reset on top.
04
A new vanity cabinet with a quartz or stone top, sinks, faucets, mirror and lighting in the same spot.
05
A new toilet, faucets, shower valve trim, towel bars and hardware in one finish.
06
New vanity lighting, recessed lights and a quiet fan vented outside.
07
Walls, ceiling, baseboards and door trim finished to match the new tile.
The honest answer after the in-home visit is usually a mix. These are the typical calls.
The layout, a tub in good condition, a solid vanity cabinet with a new top, a working fan, a toilet that is not the problem, wall tile outside the wet area if it is sound.
Shower or tub-surround tile with cracked grout, a fiberglass surround, a vanity with water damage at the base, vinyl flooring, a leaking shower door, fixtures in mixed finishes.
Wall tile that looks fine but sounds hollow, a subfloor that flexes, a fan that runs but does not move air, and any plumbing shutoff that has not been turned in years.
5.0 on Google from 140+ reviews
"Professional, reliable, and skilled. Alex completed our bathroom remodel on time and within budget. The quality of workmanship exceeded our expectations. We couldn't be happier with the results!"
Robert G.
"Alex did a phenomenal job on our kitchen remodel!! He works fast and is meticulous. He really cares about the quality of his work and the satisfaction of his clients. We are so pleased with how our cabinets turned out!"
Jessee Baldwin
"Exceptional kitchen remodel and general contractor service !!! I rarely bother myself to leave feedbacks, but this guy deserves it. Highly professional and professionalism is in details- that's what this guy delivers . Alex is very positive personality, he is super punctual, intelligent and a very pleasant guy to work with . I wish him all the best in his business and without any hesitation I can recommend him to anyone who is looking high quality at a fair price."
Victor C.
Tell us about your project and we'll set up a free, no-obligation consultation.
Our team takes precise measurements of your walls and rooms to ensure accuracy.
We create a detailed project plan and a 3D visualization to help you envision the final result.
Once you approve the project, we handle the purchase and delivery of all materials and begin the work.
We come to the house, look at the bathroom, take measurements and listen. The written estimate follows after the visit, not on the spot.
Cabinet doors, stone and tile samples come with us, so you compare them next to your floor and walls. The full set is at our office in downtown Bellevue.
Plumbing, electrical, tile and carpentry under one Washington license and one schedule, with one person to call.
One year on our work after completion. Materials carry their manufacturers' warranties, and anything found behind the walls is priced separately.
If the layout works and the walls behind the tile are dry, a partial renovation usually is. If the tile is failing because the wall behind it is wet, or the layout is the problem, a full renovation is the better investment. We tell you which after the visit.
Yes. A shower rebuild on the same footprint, with new waterproofing, tile and glass, is one of the most common partial projects.
Rarely exactly, so we plan the transitions: new floor with the old wall tile, or a new shower with a painted wall next to it, so nothing looks like a patch.
Yes, most homeowners stay. We keep the work area clean and contained so the rest of the house stays usable, and we tell you in advance on which days the bathroom is out of use.
It happens in older homes: old wiring, water damage, plumbing that has to be brought up to code. That is separate work, priced separately from your original estimate, and we show it to you before it is done.
Yes. One year on our workmanship. Materials are covered by their manufacturers' warranties.
Most bathrooms don't wear out all at once. The shower tiles crack while the bathtub remains intact, or the vanity cabinet swells at the base even though the floor remains in good condition. A partial bathroom remodel in Bellevue replaces the parts that are worn and keeps the ones that still work, on the layout you already have. It suits homeowners who like how the room is arranged and want the worn parts gone without living through a full gut.
The sections below help you decide how much work your bathroom really needs, which upgrades pair well, and what sets the price before anyone opens a wall.
The three terms describe how deep the work goes, not how good the result looks.
A bathroom refresh in Bellevue changes only what can be replaced without demolition. Paint, lighting, mirror, faucets, shower trim and hardware, sometimes a new stone top on a sound vanity cabinet. This is suitable for a room that is well-built but looks old-fashioned.
A minor bathroom remodel in Bellevue adds light demolition: a new vanity, new floor tile, a new toilet and often a quieter fan. The shower or tub area stays as it is.
A partial renovation goes into the wet area. The shower or tub surround comes out to the studs and gets new waterproofing, tile, a valve and glass, usually together with the floor or the vanity. Levels can also be mixed across the house: a refresh in the guest bath and a partial renovation in the primary one, planned and scheduled as one project.
You can tell a lot about the scope yourself. Five quick checks, and a note of what you find makes the visit shorter:
Most projects combine two or three upgrades, planned together so the room is opened once. A partial bathroom renovation in Bellevue usually follows one of four patterns.
In primary bathrooms of 1990s and 2000s homes, the usual pair is the shower and the floor. A fiberglass stall becomes a tiled shower with a niche and glass on the same footprint, and the builder-grade floor gives way to porcelain tile. A low threshold and a niche, built in before the tile is laid, make the new shower easier to maintain. With the floor already open, a heated mat costs little extra.
Renovating a bathroom in a high-rise apartment in the city center is subject to strict rules, one must coordinate water shut-offs, reserve the elevator, and adhere to the established work schedule. A well-planned process - taking the building's schedule into account when scheduling noisy work and debris removal - allows the bathroom to be put back into service quickly.
This is where a partial project either looks finished or looks patched, so these details are settled before demolition.
The floor comes first. New tile with a heat mat and membrane sits higher than old vinyl, and when the floor rises, the toilet flange is raised too, so the toilet seals properly. If the old floor stays, the new vanity has to cover the outline of the old one.
On the walls, where new shower tile stops next to old wall tile or paint, a metal or stone edge gives a clean line. Grout color is chosen to sit well next to the tile that stays. Valve trim fits only its matching valve body, so if the brand changes, the valve inside the wall changes too. Finally, the walls are painted corner to corner, not touched up around the new work.
The partial bathroom remodel cost in Bellevue depends less on the size of the room, than on what happens in the wet area. The final cost is primarily influenced by the tile size and format, waterproofing, frameless glass structures, the vanity countertop, and the number of plumbing fixtures. Retaining the existing plumbing layout minimizes piping installation costs, which accounts for the main savings in a partial renovation.
Saving works on what you can see and change later: porcelain instead of natural stone, a standard vanity cabinet with a custom top, a sound tub that stays. It doesn't work on what gets sealed behind tile: waterproofing, the shower valve and the fan duct. Redoing those later means opening the new wall again.
A refresh costs the least, because nothing is torn out. A minor remodel adds demolition, floor preparation and a new vanity. A partial renovation adds the most: the wet area is rebuilt from the studs with new waterproofing, tile and glass. Tile and glass choices can still set two similar bathrooms far apart.
Hidden conditions are the main unknown: water-damaged framing, a shutoff that breaks, wiring that has to be brought up to code. They are shown to you and priced separately before work continues, so the estimate stays tied to the scope you approved.
A refresh rarely takes the room out of use for more than a day at a time. A minor remodel takes the toilet out for a few days while the floor tile is set and grouted. A shower rebuild needs the most patience: waterproofing cures before tile, and frameless glass is measured only after the tile is set, so the last step waits for the glass to be made, which can add a week or more. The work is sequenced so the toilet is back in place as early as possible. You know in advance which days you will be without water or a toilet, which matters most if this is your only bathroom.
The next step is an in-home visit. Tile, stone and vanity samples come with us, the room is measured, and we draft together what stays and what goes, the written estimate follows the visit. A 3D model shows how the new work meets the old before anything is ordered. Book a free consultation on raincityllc.com or call (253) 466-8709.
Send the form or call (253) 466-8709. We come to your home with the samples, and a written estimate follows the visit.