Marble-look porcelain tile bathroom after a full renovation

Full bathroom remodel in Bellevue

Down to the studs and back: new layout, plumbing, waterproofing, tile, shower, vanity and lighting, built by one team.

Book Your Free Consultation

Free in-home visit. Written estimate after the visit.

Ready to start over with the whole bathroom?

Some bathrooms cannot be fixed one piece at a time. The tile is failing because the wall behind it is wet, the layout wastes half the room, and every fixture is the one the builder chose. Replacing the vanity would only make the rest look worse.

A full renovation takes the room down to the studs and rebuilds it: layout, plumbing, electrical, waterproofing, tile, shower or tub, vanity, toilet, lighting and ventilation. You approve the whole thing in 3D first, and one licensed team builds it on one schedule.

Vanity with a black vessel sink and a mosaic tile floorMarble tile shower with black fixtures and a nicheMarble-look porcelain tile shower with black fixtures and a mosaic nicheFloating vanity with a glass shower enclosureGray tile shower with a bench, a niche and lightingBathroom with a double vanity and a wide mirrorWood-look tile shower with a niche and a handheld showerTub surround in patterned tile with a niche and a shelf

What a full bathroom renovation includes

Everything in the room, in the order it is built.

Room stripped to the studs during a renovation

01

Demolition to the studs

Old tile, fixtures, vanity and flooring out, the walls and subfloor checked for damage before anything new goes in.

Renovated bathroom with a new layout and marble-look tile

02

New layout

Shower, tub, toilet and vanity placed where they work best, with the plumbing moved to match.

Marble shower with black fixtures after a renovation

03

Plumbing and electrical

New drains and supply lines, shower valve, a properly vented fan, lighting circuits, outlets and a heated floor circuit.

Tiled shower wall with a mosaic niche

04

Waterproofing

The shower area and the floor waterproofed before tile, the step that decides whether the bathroom lasts.

Tiled shower with a bench, a niche and lighting

05

Tile shower or tub

A tiled shower with a niche, a bench and a glass door, or a new tub with a tiled surround.

Wood-look tile in a renovated shower

06

Floors and walls

Porcelain, natural stone or glass tile, heated floors as an option, painted walls elsewhere.

Double vanity with a stone top and a wide mirror

07

Vanity, top and mirror

A custom or standard vanity with a stone top, sinks, faucets, mirror and lighting.

Glass shower door and black hardware after a renovation

08

Fixtures and finish

Toilet, accessories, glass, trim and paint, then the debris leaves with us.

Our Process

Book a Free Consultation

Book a Free Consultation

Tell us about your project and we'll set up a free, no-obligation consultation.

Measurements

Measurements

Our team takes precise measurements of your walls and rooms to ensure accuracy.

Design and Visualization

Design and Visualization

We create a detailed project plan and a 3D visualization to help you envision the final result.

Approval and Execution

Approval and Execution

Once you approve the project, we handle the purchase and delivery of all materials and begin the work.

When a partial renovation will not do

A full renovation is the right call when several of these are true at once.

  • Tile is cracking or loose because the wall behind it is wet

  • The floor is soft near the toilet or the tub

  • The layout wastes the room: a tub nobody uses, a vanity too small for two, a toilet in the wrong place

  • The fan does not vent outside, or there is no fan

  • Every fixture and finish dates from the same builder package

  • You want heated floors, a curbless shower or a double vanity, none of which fit the current layout

What is handled for you

Every trade under one license

Rain City is a licensed, bonded and insured Washington general contractor. The plumber, the electrician and the tile setter are on our schedule, not yours.

Approved on screen first

The finished bathroom exists as a 3D model before anything is ordered or removed. Changes are made there, where they cost nothing.

Materials in, debris out

We buy and deliver the cabinets, stone and tile, take out the old bathroom and haul the debris away. Nothing waits in your driveway for someone else.

A written estimate and a one-year warranty

You get the estimate in writing after the in-home visit. The workmanship is covered for one year; materials by their manufacturers.

Our Happy Customers Say

5.0 on Google from 140+ reviews

"Professional, reliable, and skilled. Alex completed our bathroom remodel on time and within budget. The quality of workmanship exceeded our expectations. We couldn't be happier with the results!"

R

Robert G.

Customer review

"Alex did a phenomenal job on our kitchen remodel!! He works fast and is meticulous. He really cares about the quality of his work and the satisfaction of his clients. We are so pleased with how our cabinets turned out!"

Jessee Baldwin

Jessee Baldwin

Customer review

"Exceptional kitchen remodel and general contractor service !!! I rarely bother myself to leave feedbacks, but this guy deserves it. Highly professional and professionalism is in details- that's what this guy delivers . Alex is very positive personality, he is super punctual, intelligent and a very pleasant guy to work with . I wish him all the best in his business and without any hesitation I can recommend him to anyone who is looking high quality at a fair price."

V

Victor C.

Customer review

Bathrooms we have renovated

All projects
Marble-look porcelain shower with a mosaic niche and black fixtures
Marble-look porcelain shower with a mosaic niche and black fixtures
Glass shower door and black hardware
Glass shower door and black hardware
Open shelving next to the shower
Open shelving next to the shower

Planning a bathroom renovation in Bellevue

A full bathroom renovation in Bellevue takes the room back to bare framing and rebuilds it with new plumbing, wiring, waterproofing, tile, fixtures and storage. On the Eastside two same-size rooms can differ in price several times over, and the spread is not random: it follows a few decisions you can see coming. Here is how the number is built, what local houses add to it, how many weeks the work takes and which choices keep the final invoice close to the first estimate.

How much does a gut remodel cost on the Eastside?

The full bathroom remodel cost in Bellevue falls into three typical tiers. Total floor area matters less than the extent of upgrades to building systems, and national averages rarely align with prices in the Eastside area.

Hall or guest bathroom on the same layout, 40 to 60 square feet: the entry tier. New tub or shower, tile, vanity with a stone top, toilet, fan and lighting.

  • Mid-size bathroom with a reworked layout: the middle tier. The toilet or vanity moves, the tub becomes a walk-in shower, heated floors go in.
  • Primary suite: the top tier. A large curbless shower, a double vanity, natural stone, frameless glass, sometimes a wall shifted to borrow space from a closet.

A quote that looks far cheaper than others for the same scope usually leaves something out: waterproofing, permits, glass or electrical work.

Most of the budget goes into work you will never see once the room is finished: new drains and supply lines, wiring, a sloped shower pan and a continuous waterproof membrane. This determines whether the bathroom will remain dry for decades to come. Next comes the tiling: cladding the shower area all the way to the ceiling - including the niche and the seat - requires several days of painstaking work.

The vanity, top and fixtures follow, and this is where finish choices swing the budget most. A semi-custom vanity and a mid-range faucet set cost a fraction of designer equivalents and look nearly the same once installed. Frameless glazing, underfloor heating mats, and a quiet exhaust fan are the kinds of details homeowners often overlook. The cost of concealed work is largely independent of the chosen finish, consequently, it is during the interior design phase that a significant cost difference arises between two bathrooms of the same size - and this is precisely where you retain control over the situation.

What your Bellevue house adds to the bill

The age and type of the home explain more of the price spread than finishes do.

Ramblers and split-levels from the 1960s to 1980s in Lake Hills, Newport Hills, Somerset or Woodridge often hide galvanized supply lines, cast-iron drains, ungrounded circuits and a fan that vents into the attic. A soft floor around the toilet usually means subfloor repair. None of this is visible during the estimate, which is why a complete bathroom renovation in Bellevue in an older house should carry a contingency of 10 to 15 percent.

Condos in Downtown Bellevue and the Spring District bring a different list: HOA approval of the plans, reserved elevator time, limited working hours, scheduled water shutoffs for the whole riser and a certificate of insurance for the building manager. These add days rather than materials, so we plan them in from the first visit.

Newer houses usually have sound framing and current plumbing, so almost the whole budget goes into what you see. Their surprises tend to be builder shortcuts instead: tile on thin mortar, a shower pan with too little slope.

Costs that rarely appear in the first number

Before comparing estimates, check whether each one covers:

  • plumbing and electrical permits and inspections, required whenever drains, supply lines or circuits change;
  • sales tax on materials and labor;
  • realistic allowances, not placeholder amounts for tile and fixtures nobody has chosen yet;
  • frameless glass, which is measured after tile and ordered last;
  • debris hauling and protection for floors in the rest of the house.

It is easier to trust an itemized quote - listing the product name, quantity, and price for each item - than one based on estimated costs. Pay attention to the payment schedule as well: payments tied to the completion of specific work stages (such as installing utility systems, laying tile, and project handover) offer better protection than making a large upfront payment.

Upgrades worth adding while the walls are open

Some heating system components are inexpensive to install during a major renovation but costly to address afterward, as they are located inside walls or beneath tiling. Underfloor heating is installed first, the mat and its circuit are laid before the tiles. An exhaust fan with a humidity sensor vents to the outside to dry the room, ensuring no one forgets to turn it on.

A shower niche and a medicine cabinet recessed between the wall studs provide extra storage, while outlets inside the vanity drawer allow for plugging in a hairdryer and chargers, keeping the countertop clutter-free. At this stage, it is also essential to plan the wiring for multi-level lighting: a recessed light over the shower, task lighting at face level near the mirror, and a low-mounted nightlight. Installing blocking for future grab bars will make upgrading safety later a simple one-hour job - eliminating the need to retile.

How long does it take, week by week?

A full bathroom remodel in Bellevue runs in two stages. Design, selections and the permit usually take three to six weeks, Bellevue reviews permits online, and the review runs while you finalize tile and fixtures. Construction then takes five to eight weeks for a typical room:

  1. Week 1: demolition to the studs, inspection of framing and subfloor, any repairs priced and approved.
  2. Week 2: rough plumbing and electrical, then the rough-in inspection.
  3. Week 3: backer board, waterproofing and a flood test of the shower pan.
  4. Weeks 4 and 5: wall and floor tile, niche, bench and grout.
  5. Week 6: vanity, stone top, toilet, fixtures, lighting and paint.
  6. Weeks 7 and 8: frameless glass templated and installed, final inspection, cleanup.

A custom vanity or a special-order slab can stretch the schedule, so both are ordered before demolition starts, while the permit is still in review.

Planning your project

A complete bathroom remodel in Bellevue runs best when scope, price and schedule are on paper before demolition starts. Our free in-home visit covers measurements, tile and stone samples you can see in your own light, and an honest read on what may be hiding behind the walls.

Before you call: the questions we hear most

What is the difference between a full and a partial renovation?

A full renovation replaces everything in the room, usually down to the studs, and can change the layout. A partial renovation keeps the layout and some elements and replaces the rest, for example the shower and the floor but not the vanity.

Can the layout change in a full renovation?

Yes. That is the main reason to go full: the toilet, the vanity and the shower can move, and the plumbing is rebuilt to the new plan under a permit.

Will the second bathroom be enough while the work is on?

Most families manage with one bathroom during the work. We tell you in advance on which days the water is off and keep the work area contained.

Do you offer financing?

Yes. We partner with financing providers and can help you find a payment plan that fits your budget, including low-interest and promotional options.

Do I need a permit for a bathroom remodel?

Most do when plumbing, electrical or structure change; a like-for-like swap of fixtures on the same layout usually does not. We handle the permit application with your city and make sure the work meets local building codes.

Can I stay in the house during the work?

Yes, most homeowners stay. We keep the work area clean and contained so the rest of the house stays usable, and we tell you in advance on which days the bathroom is out of use.

Ready to start? Book Your Free Consultation

Send the form or call (253) 466-8709. We come to your home with the samples, and a written estimate follows the visit.

Service Area

We are proudly serving Seattle & surrounding areas

Medina, WA
Newcastle, WA
Woodinville, WA
Yarrow Point, WA
Bothell, WA
Mercer Island, WA
Redmond, WA
Seattle, WA